Genlink-DCP: Transfer Switch

(See your user notes for this page.)
 This screen allows the configuration and exercise of an external transfer switch.

Load Accept Voltage
This is the average generator voltage threshold above which the voltage is deemed good enough to perform a transfer to the generator.

Load Accept Frequency
This is the generator frequency threshold above which the frequency is deemed good enough to perform a transfer to the generator.

Engine Warmup Time
The generator must run for this amount of time before the transfer switch will transfer the load to the generator.

Engine Cooldown Time
After the load has been transferred back to the utility, the engine will continue to run for this amount of time to allow it to cool down.

Minimum Run Time
The engine must run for at least this amount of time before the engine will be stopped.

Nominal Voltage
This is the nominal line-to-line system voltage for 3 phase or single phase. (i.e. for single phase, enter 240V for a 240V L-L and 120V L-N).

Deviation
This is the amount of volts that the average utility voltage is allowed to vary by, before it is deemed bad and a tranafer to the generator is required. So the limits would be Nominal voltage +/- deviation.

Hysteresis
When the generator is running because the average utility voltage has gone outside the limits, the system will only return to utility when the average utility voltage exceeds the limit by the hysteresis voltage. For example, if the low limit is 430V and hysteresis is set to 10V, then the utility must reach 440V before a transfer will be initiated.

Softloading
Transfer at this percentage of load
When softloading is requested either from utility to generator or vice versa, the switch is set so that both sides are closed and power can be sourced from either utility or generator. The generator power will be ramped up from a minimum power towards a percentage of the current utility load. The slope of the ramp is calculated such that the full target power will be requested at the end of the ramp time. The switch will then transfer the load to the generator, and the load will be fully powered from this source. Once the ramp time has been exceeded we will transfer even if the actual power has not reached the target. The percentage of load that we transfer at is entered into this parameter. The maximum percentage is set to 95%.

Ramp time for transfer(s)
When softloading is requested either from utility to generator or vice versa, the switch is set so that both sides are closed and power can be sourced from either utility or generator. The generator power will be ramped (up or down) depending on which way we are transferring (either to utility or generator). The ramp time (in seconds) to reach the transfer point (or percentage) is defined by this parameter. The maximum ramp time is 240s (4 minutes).

Calibration Factors
The Utility and generator voltages are measured by the HTS either for local use or for use by the Power Manager. The calibration factors allow the voltage readings to be more accurately calibrated. The average measured voltages are displayed via GenLink and the +/- buttons are used to calibrate the displayed average voltages to read the same as a meter. The calibration factors aree stored in permanent memory in the Power Manager and are downloaded to the HTS when required. Normally the Power Manager will use its own measurement for generator voltage, so the generator calibration factor is only used if the communications become faulty.

Signal Before Transfer Time
Before a transfer is initiated (that is, a trnafer that will cause a loss of supply to the load), a signal called "signal before transfer" will be activated to allow things like elevators to park. This setting dictates how soon before the transfer that the signalwill be activated. The signal can be de-activated by setting this field to zero. It is not necessary for a CTTS type switch as there is no supply interruption, however the signal can still be generated. For an OTTS type switch, it is necessary for transferring back from generator to utility. It is also necessary when transferring from utility to generator while in test or exercise mode. Normally, utility has disappeared and we do not want a delay while sb4 is activated. In fast test the SB4 timer is not reduced by design.

Note that the line interruption and return to utility timers are resident in the G/H panel and communicate the transfer requirements to the switch controller. This means that there can be up to a one second additional delay for the communications to take place. This is not true of the TDN and signal before transfer timers which reside in the switch controller.

Transfer Switch CT Ratio
The power through the switch can be measured if optional CT's are fitted. The size of the CT's must be entered into this field if they are fitted. A 300:5 CT would have a ratio of 60. The CT ratio can be adjusted to calibrate the average current and hence the measured power.

Line Interruption Delay
The utility voltage must be outside the limits continuously for this amount of time before a transfer is initiated.

Return to Utility Delay
The utility must be deemed good for this minimum amount of time before the load will be transferred back to the utility. This timer can be aborted by pressing the "Return To Normal" switch.

Battery Voltage
The internal 'AA' batteries are monitored by the transfer switch and the voltage is displayed here. If this voltage reads higher than 4.5 Volts then either the batteries are not fitted or have become disconnected. A reading lower than 3.2V indicates that the batteries may need to be changed.

Transfer Type
There are several types of transfer that can take place. Some of these types are dictated by the switch.
Inphase
This selects an inphase transfer for either a CTTS or OTTS type switch, whenever there are two live sources. If only one source is live(either CTTS or OTTS type), the switch will perform a TDN type transfer using the TDN time setting. You cannot select both an inphase and TDN type transfer together.

TDN
This selects a Time Delay Neutral transfer with an associated time that the switch must remain in the neutral position. TDN will always occur if selected, even if there is only one live source. You cannot select both an inphase and TDN type transfer together. The default TDN time is set to 1 second if communications are never established. Note that if the Auto/Manual - disconnect switch is operated during TDN, the timer will be overridden and the transfer will complete as soon as the manual/disconnect switch is operated. Also note that TDN will not be applied if the switch controller is powered up with live utility and the switch not in the utility position, an instant transfer will take place.

CTTS
This tells the Power Manager whether the switch is a CTTS type or an OTTS type. This must be set correctly as it also tells the switch which type of membrane keypad is attached (there are two types, one for the OTTS and one for the CTTS).

TDN if fail to sync
When an inphase transfer is selected (either CTTS or OTTS) and we fail to synchronize within the timeout period, a TDN transfer is done, whatever is slelected via Genlink. The "TDN if fail to synch" setting just calls for a synch timeout of 10 mins. If this is not selected, we will do a TDN anyway after half an hour. A Synch timeout will light the "fail to synch LED" (for the OTTS switch, both utility available and standby operating LEDs will flash). After a synch, the system can still function because the next try will reset the error.