This screen allows the configuration and exercise of an
external transfer switch.
- Load Accept Voltage
- This is the average generator voltage threshold above which the
voltage is deemed good enough to perform a transfer to the
generator.
- Load Accept Frequency
- This is the generator frequency threshold above which the
frequency is deemed good enough to perform a transfer to the
generator.
- Engine Warmup Time
- The generator must run for this amount of time before the
transfer switch will transfer the load to the generator.
- Engine Cooldown Time
- After the load has been transferred back to the utility, the
engine will continue to run for this amount of time to allow it to
cool down.
- Minimum Run Time
- The engine must run for at least this amount of time before the
engine will be stopped.
- Nominal Voltage
- This is the nominal line-to-line system voltage
for 3 phase or single phase. (i.e. for
single phase, enter 240V for a 240V L-L and
120V L-N).
- Deviation
- This is the amount of volts that the average utility voltage is
allowed to vary by, before it is deemed bad and a tranafer to the
generator is required. So the limits would be Nominal voltage +/-
deviation.
- Hysteresis
- When the generator is running because the average utility
voltage has gone outside the limits, the system will only return to
utility when the average utility voltage exceeds the limit by the
hysteresis voltage. For example, if the low limit is 430V and
hysteresis is set to 10V, then the utility must reach 440V before a
transfer will be initiated.
- Softloading
- Transfer at this percentage of load
- When softloading is requested either from utility to generator
or vice versa, the switch is set so that both sides are closed and
power can be sourced from either utility or generator. The
generator power will be ramped up from a minimum power towards a
percentage of the current utility load. The slope of the ramp is
calculated such that the full target power will be requested at the
end of the ramp time. The switch will then transfer the load to
the generator, and the load will be fully powered from this source.
Once the ramp time has been exceeded we will transfer even if the
actual power has not reached the target. The percentage of load
that we transfer at is entered into this parameter. The maximum
percentage is set to 95%.
- Ramp time for transfer(s)
- When softloading is requested either from utility to generator
or vice versa, the switch is set so that both sides are closed and
power can be sourced from either utility or generator. The
generator power will be ramped (up or down) depending on which way
we are transferring (either to utility or generator). The ramp
time (in seconds) to reach the transfer point (or percentage) is
defined by this parameter. The maximum ramp time is 240s (4
minutes).
- Calibration Factors
- The Utility and generator voltages are measured by the HTS
either for local use or for use by the Power Manager. The
calibration factors allow the voltage readings to be more
accurately calibrated. The average measured voltages are displayed
via GenLink and the +/- buttons are used to calibrate the displayed
average voltages to read the same as a meter. The calibration
factors aree stored in permanent memory in the Power Manager and
are downloaded to the HTS when required. Normally the Power
Manager will use its own measurement for generator voltage, so the
generator calibration factor is only used if the communications
become faulty.
- Signal Before Transfer Time
- Before a transfer is initiated (that is, a trnafer that will
cause a loss of supply to the load), a signal called "signal before
transfer" will be activated to allow things like elevators to park.
This setting dictates how soon before the transfer that the
signalwill be activated. The signal can be de-activated by setting
this field to zero. It is not necessary for a CTTS type switch as
there is no supply interruption, however the signal can still be
generated. For an OTTS type switch, it is necessary for
transferring back from generator to utility. It is also necessary
when transferring from utility to generator while in test or
exercise mode. Normally, utility has disappeared and we do not
want a delay while sb4 is activated. In fast test the SB4 timer
is not reduced by design.
Note that the line interruption and return to utility timers are
resident in the G/H panel and communicate the transfer requirements
to the switch controller. This means that there can be up to a one
second additional delay for the communications to take place. This
is not true of the TDN and signal before transfer timers which
reside in the switch controller.
- Transfer Switch CT Ratio
- The power through the switch can be measured if optional CT's
are fitted. The size of the CT's must be entered into this field
if they are fitted. A 300:5 CT would have a ratio of 60. The CT
ratio can be adjusted to calibrate the average current and hence
the measured power.
- Line Interruption Delay
- The utility voltage must be outside the limits continuously for
this amount of time before a transfer is initiated.
- Return to Utility Delay
- The utility must be deemed good for this minimum amount of time
before the load will be transferred back to the utility. This
timer can be aborted by pressing the "Return To Normal" switch.
- Battery Voltage
- The internal 'AA' batteries are monitored by the transfer
switch and the voltage is displayed here. If this voltage reads
higher than 4.5 Volts then either the batteries are not fitted or
have become disconnected. A reading lower than 3.2V indicates
that the batteries may need to be changed.
- Transfer Type
There are several types of transfer that can take place. Some of
these types are dictated by the switch.
- Inphase
- This selects an inphase transfer for either a CTTS or
OTTS type switch, whenever there are two live sources. If
only one source is live(either CTTS or OTTS type), the
switch will perform a TDN type transfer using the TDN time
setting. You cannot select both an inphase and TDN type
transfer together.
- TDN
- This selects a Time Delay Neutral transfer with an
associated time that the switch must remain in the neutral
position. TDN will always occur if selected, even if there
is only one live source. You cannot select both an inphase
and TDN type transfer together. The default TDN time is
set to 1 second if communications are never
established. Note that if the Auto/Manual - disconnect
switch is operated during TDN, the timer will be overridden
and the transfer will complete as soon as the
manual/disconnect switch is operated. Also note that TDN
will not be applied if the switch
controller is powered up with live utility and the switch
not in the utility position, an instant transfer will take
place.
- CTTS
- This tells the Power Manager whether the switch is a
CTTS type or an OTTS type. This must be set correctly as
it also tells the switch which type of membrane keypad is
attached (there are two types, one for the OTTS and one for
the CTTS).
- TDN if fail to sync
- When an inphase transfer is selected (either CTTS or
OTTS) and we fail to synchronize within the timeout period,
a TDN transfer is done, whatever is
slelected via Genlink. The "TDN if fail to synch" setting
just calls for a synch timeout of 10 mins. If this is not
selected, we will do a TDN anyway after half an hour. A
Synch timeout will light the "fail to synch LED" (for the
OTTS switch, both utility available and standby operating
LEDs will flash). After a synch, the system can still
function because the next try will reset the error.