I got to work to see this in the parking lot

Good times and redundant fiber lie ahead…


Proposed Route Proposed Route
Note the orange markings showing existing fiber. It's going to be a little close for the directional boring guys…
Proposed dual entrance route - Building Penetration Proposed dual entrance route – Building Penetration
They're going to get in there with a bobcat and dig down, then drill a hole in the side of the building to shove the fiber through.


3 thoughts on “I got to work to see this in the parking lot”

  1. picture this in your head

    I can imagine paul standing out there while they dig with a cattle-prod in hand shouting "If you touch my existing cable, I will shock you." lol

    1. Re: picture this in your head

      The existing cable does not belong to us. Our existing cable enters on the other side of the building (this is the final leg of a diverse fiber entrance). The other fiber belongs to a competitor of ours. (and theirs is diverse too)

    2. Re: picture this in your head

      I did do something similar to this when they were resurfacing part of the parking lot right over our existing single entrance fiber, though.

Leave a Reply